Skip to content
Green Meadow School
Explore
Explore
Schools
Translate
Search Site
SCHOOLS
Show submenu for SCHOOLS
SCHOOLS
MAYNARD PUBLIC SCHOOLS
GREEN MEADOW SCHOOL
FOWLER SCHOOL
MAYNARD HIGH SCHOOL
ATHLETICS
ABOUT US
Show submenu for ABOUT US
ABOUT US
CONTACT INFORMATION
HOURS AND DIRECTIONS
KINDERGARTEN INFORMATION
MA STATE REPORT CARD
OLD WING BUILDING UPDATES & DONATIONS
SCHOOL CALENDARS
SCHOOL COUNCIL
STAFF DIRECTORY
FOOD SERVICES
Show submenu for FOOD SERVICES
FOOD SERVICES
APPLY FOR FREE OR REDUCED LUNCH
MAYNARD FOOD SERVICE INFORMATION
MENU (CLICK ON BREAKFAST OR LUNCH)
PREPAY FOR MEALS- MYSCHOOLBUCKS
FOR FAMILIES
Show submenu for FOR FAMILIES
FOR FAMILIES
BEFORE AND AFTER SCHOOL PROGRAM
ELPAC: ENGLISH LEARNER PARENT ADVISORY COUNCIL
EMERGENCY PREPAREDNESS STATEMENT
GMS ANONYMOUS INCIDENT FORM
HEALTH SERVICES
KINDERGARTEN INFORMATION
PTO (PARENT TEACHER ORGANIZATION)
SEPAC: SPECIAL EDUCATION PARENT ADVISORY COUNCIL
SCHOOL CALENDARS
SCHOOL HANDBOOK
STUDENT SERVICES/SPECIAL EDUCATION
VOLUNTEER
WHO DO I CALL IF...
MPS PROJECTS
Show submenu for MPS PROJECTS
MPS PROJECTS
ALUMNI FIELD BLEACHER PROJECT
GMS BUILDING PROJECT
OUR PROGRAMS
Show submenu for OUR PROGRAMS
OUR PROGRAMS
ART
GREEN MEADOW SOCIAL EMOTIONAL LEARNING
LIBRARY
LITERACY
MUSIC
PRESCHOOL
SPANISH IMMERSION
TECHNOLOGY DEPARTMENT
Show submenu for TECHNOLOGY DEPARTMENT
GMS LINKS
DISTRICT TECHNOLOGY OVERVIEW
AFFORDABLE INTERNET PROGRAMS
ASPEN SIS
NEW STUDENT REGISTRATION
SOCIAL MEDIA GUIDELINES
ACCEPTABLE USE POLICY
HELPDESK
TECHNOLOGY
Show submenu for TECHNOLOGY
TECHNOLOGY
ASPEN OVERVIEW
NEW STUDENT REGISTRATION
REPORT CARD INSTRUCTIONS
More
Show submenu for
Frequently Asked Questions
Fundamental Questions
What is the timeline of the project?
Why do we need a new elementary school building?
What is the Massachusetts School Building Authority (MSBA) and what is their connection to the Green Meadow Elementary School project?
What is the Green Meadow Elementary School Building Committee?
What is the current project status? Where are we now and where are we going?
When will the Town vote to fund the project?
Is there a project Facebook page, and if so, where is it located?
Where can I find the past MSBA submissions?
Where can I find Building Committee meeting minutes?
Was there substantial opportunity for community input for the Green Meadow school project from the start, i.e about the basic design and location of this school including use of renewables as an energy source, energy efficiency and conservation, etc)?
Wouldn’t it make more sense to reopen the Fowler School site as a possibility for Green Meadow, providing geothermal for both?
Was there a third-party review by professional engineers of the site, building, and HVAC system?
I do not feel I can vote for the existing Green Meadow School Plan. Is there any way we can stop this now and start over with more community engagement?
What happens if the Town vote for this project fails? How do we restart the process with MSBA?
Project Site
What was the process in determining the appropriate site for the proposed Green Meadow Elementary School project?
What’s been the process / due diligence taken to understand soil conditions (foundation-bearing suitability and environmental concerns) on the chosen, existing Green Meadow Elementary School site?
Has the existing building been analyzed such that there isn’t a concern with its structural integrity as construction operations and ledge hammering happens adjacent to it?
How is the new school going to be built while the existing building and site is occupied? What is the plan for construction access, etc.?
How much tree clearing is going to take place to construct this project?
Are the proposed play areas shown on the plans intended for School use? Public? Both?
Doesn’t the current, proposed site layout pose greater risk to walkers from Great Rd. that will need to cross another street to access the new building? Could this end up requiring a crossing guard?
Please advise on the coordination and thought process behind the current location of the playground area to the side / west of the new building as it relates to safety, etc.
Were bicycle lanes considered for the roadways within the school site?
For the solar field issue, does the possible installation of a solar field have to be on this GM property? Can a canopy over the Crowe parking lot be a consideration? Can it be located somewhere else within the school’s complex or elsewhere in town?
How does the road behind the school account for deliveries, trash/recycling pick up and parent drop off/pick up. That one drive appears to have multiple needs and I’m wondering if consideration for overlap has been taken into account. What if a delivery is happening at the same time as drop off/pick up? Is there room to accomplish both simultaneously?
Design Alternative Selection
What was the process in coming up with the chosen new construction design scheme?
Was energy consumption and production potential estimated for each of the seven schematics developed and provided to the building committee and/or the public along with the different design options?
Building
What are some of the sustainable features being incorporated with the project design?
What is the HVAC system that was selected for the new building?
Can I please see the energy modeling done for the projected operating costs of each HVAC system?
Is there a reason that 'cooling' is not listed as a pro in options 1 and 2 within the life cycle cost analysis (LCCA)?
Project Costs
What will this project cost?
How much will my taxes increase?